Quality Control & Project Documentation

Review the HDPE pipe, inspection plan and project submittals before the shipment leaves the factory. Puhui Industry helps procurement teams link the specified material and pipe dimensions to batch test reports, packing records and the documents needed for site acceptance.

Product Identification & Batch Traceability

Puhui’s HDPE pressure pipe range includes options made from virgin PE100, PE4710 and PE100-RC. The proposed grade, outside diameter (OD) series, DR or SDR and product standard are identified in the technical offer. That gives the reviewer a direct way to compare the proposed pipe with the purchase specification.

The pipe marking and production lot link the delivered pipe to its inspection report. The report records the finished pipe specification, compound grade and material batch. Ask to see the marking format and agree how the bundle or crate identifiers will appear on the packing list. Your receiving team can then match each delivery to its approved line item.

Laser marking on Puhui’s IPS PE4710 pressure pipe.

Factory Inspection & Laboratory Testing

Puhui samples production batches for visual and dimensional inspection, melt mass-flow rate (MFR) and hydrostatic testing under the applicable product specification. Before production, Puhui can agree the inspection and test plan (ITP), including additional tests, sampling, witness points and release documents.

Appearance and dimensions
Surface condition, outside diameter, wall thickness and out-of-roundness (ovality). Use the measured values and tolerances to verify pipe dimensions before installation.
Material and thermal properties
MFR links the processed pipe to the material requirements. The ITP can call for density and oxidation induction time (OIT) results where required.
Pressure performance
Hydrostatic strength testing records whether the sample meets the specified conditions and acceptance criteria. ISO 1167 is a test method used in applicable PE pipe specifications.

What a batch report shows
One Puhui inspection report for 110 mm OD, SDR 13.6 PE100 pipe links the resin and production lots to measured wall thickness, ovality, MFR and OIT results and records the hydrostatic test outcome. The report identifies ISO 4427-2 as the product specification.

Puhui supports third-party factory inspection with agencies such as SGS, Bureau Veritas and Intertek. Agree witness testing, pre-shipment inspection and the reports your inspector needs in the ITP.

Product Standards & Certification Scope

The submittal identifies the specified standard and edition, the OD series, the material grade and the pressure class for the products offered. Check these together so the pipe, fittings and equipment match the approved schedule.

International and European specifications
ISO 4427 and EN 12201 for PE piping within the relevant product and service scope. Quote each part of the system against the standard required by the project.
North American specifications
ASTM F714 and ASTM D3035 specify OD-based PE pressure pipe. ASTM D3350 classifies PE compounds. For water service, AWWA C901 covers nominal sizes ¾–3 in. and AWWA C906 covers nominal sizes 4–65 in. for waterworks. Verify the required IPS or DIPS series and actual OD on the pipe and fitting schedule.
Australian and New Zealand specifications
AS/NZS 4130 for PE pressure pipe where specified by the project. Confirm the matching fitting specification in the submittal.

Evaluate each approval against its service, product, size range and manufacturing site. Puhui’s certificate library includes FM 1613 listings for buried fire protection products, NSF/ANSI/CAN 61 listings for drinking-water contact, WRAS material approvals and Bureau Veritas water-pipe annexes. The ISO 9001 certificate covers the quality management activities listed on the certificate.

Fusion Procedures & Field Weld Records

Puhui can provide joining guidance and operating instructions for the supplied pipe, fittings and equipment. Where required by the project, use an approved butt-fusion procedure referencing ASTM F2620. The procedure sets the requirements for facing and alignment, heater temperature, pressure, heat soak and cooling. Electrofusion follows the fitting’s specified cycle or barcode and the compatible controller instructions.

The site crew can use these documents to log each joint ID, location, operator, equipment, cycle and any inspection results. Linking that weld log to the pipe and fitting records gives the supervising engineer a traceable record for handover.

Crew using a hydraulic butt-fusion machine on large-diameter HDPE pipe
Field butt fusion of large-diameter HDPE pipe.

Project Submittal Package

Agree the document list at quotation so the required evidence is ready for the project reviewer. Puhui supplies a factory inspection report and packing list with the shipment. Resin certificates, signed conformity declarations and project-specific records can be included in the agreed document schedule.

Resin Certificate / COA
Resin grade and material lot reference for the approved pipe. List the resin supplier’s Certificate of Analysis (COA) in the document schedule when required.
Mill Test Report / Factory Inspection Report
Product dimensions, production lot, inspection criteria and the test results recorded for the order under the approved ITP.
Conformity Documents & Packing List
Shipment quantities and identifiers for receiving checks. Agree the links between bundle marks, product lots and any signed Certificate of Conformity (CoC) required for release.
Fusion Procedure & Equipment Instructions
Joining guidance for the supplied pipe, fittings and equipment. Include the procedure reference and required field documentation in the project submittal.

Put Your Inspection and Document Requirements in the Quote

Send your pipe schedule or the relevant specification pages. Puhui can review the proposed pipe and fittings, the required test reports, the certificate scope and any third-party inspection points with your team.

Request a Quote & Document List

Request a Quote

Get a formal quote or request a free test sample. A short message about your project is enough to get started.

We usually respond within 12 hours on business days. We treat your enquiry as confidential. Privacy information