Match the Site Supply to the Machine Nameplate
Ask for the nameplate or electrical data for the exact machine you are ordering. Check the heater, facer, and hydraulic power unit on a butt fusion machine, or the controller input on an electrofusion machine.
| Supply | Nominal voltages to check | Typical equipment |
|---|---|---|
| Single-phase | 110–120 V or 220–240 V | Smaller butt fusion machines and portable electrofusion controllers |
| Three-phase | 380 V, 400 V, 415 V, or 480 V | Many larger hydraulic butt fusion machines |
- 50 Hz or 60 Hz. Confirm that the complete machine is rated for the site's frequency. A mismatch can change motor and pump speed and affect motor heating. A transformer changes voltage while preserving the incoming frequency. If the frequency differs, confirm an approved configuration or conversion solution with the equipment supplier.
- Plug and receptacle. Check the connector type, current rating, and neutral and earth requirements. For IEC 60309 three-phase connections, confirm whether the machine needs 3P+E or 3P+N+E.
Field rule. Have a qualified site electrician verify that any transformer or adapter is rated for the machine’s continuous load and motor starting demand.
Size the Generator and Cable Run
Allow for the Hydraulic Pump and Facer to Start
Hydraulic pumps and electric facers can draw substantially more current at start-up than while running. Use the manufacturer’s generator-sizing guidance and confirm both continuous output and motor-start capacity. If the heater is already drawing power when the facer starts, an undersized generator can sag or trip. Include any shared loads such as dewatering pumps, lights, and work-tent heaters.
Check Voltage at the Machine Under Load
A generator on an access road may be 30–100 m from the trench. Cable resistance over that distance can reduce voltage at the machine, slow heater recovery, or trip an electrofusion controller. Ask your site electrician to select the conductor cross-section (mm² or AWG) using the full cable run, load current, and the machine’s allowable voltage range. Check the machine manual for extension-lead limits and verify voltage under load at the connection point.
Match the Electrofusion Controller to the Fitting
An electrofusion welding machine needs compatible power at its input and must deliver the fitting’s required output throughout the fusion cycle.
- Output voltage, current, and duty cycle. Confirm the voltage on the fitting label or datasheet, such as 39.5–40 V or 48 V. Check current capacity, fusion time, fitting size range, and duty cycle for your largest and most demanding fittings.
- Barcode, manual entry, and leads. Confirm the controller reads the fitting’s ISO 13950 fusion barcode. Where the fitting procedure permits manual entry, check that the controller accepts the specified voltage and time. Match the terminal adapters to the fitting pins, such as 4.0 mm or 4.7 mm.
- Generator power quality. Confirm that the generator maintains voltage and frequency within the controller’s input limits throughout the weld. Check this under load even when the generator uses an inverter or automatic voltage regulation (AVR).
Check What Ships With the Machine
Confirm the packing list before dispatch so the crew can connect and set up the quoted machine on arrival.
- Power connections. Confirm the main plug, extension lead gauge, and phase sequence where the machine requires it.
- Inserts and clamps. Verify the inserts match the pipe outside diameters in the bill of materials. Check that the machine covers the required SDRs.
- Jobsite spares. Agree on model-specific spares such as heater fuses, facer blades, and hydraulic quick couplers for remote sites.
- Manuals and wiring diagrams. Confirm which documents ship with the equipment. See Product Data & Downloads for published data.
Browse our HDPE fusion equipment to compare machine ranges and published power ratings.
Four Details to Include With Your Quote Request
Include these details when you request a quote.
- Site power. Voltage, phase, and frequency, for example 380 V three-phase at 50 Hz or 230 V single-phase at 60 Hz.
- Generator nameplate. For off-grid work, send a photo showing continuous kVA or kW. Add the AVR or inverter details if available and list any loads sharing the generator.
- Estimated cable run. Give the full distance from the outlet or generator to the machine, including any extensions.
- Pipe and fitting list. Include pipe OD and SDR. For electrofusion, identify the largest fitting, specify its make and model, and send a label photo, fusion barcode, or datasheet if available.