Electrofusion Welding Machines

Fusion equipment

Electrofusion Welding Machines

Reliable HDPE jointing for mining and industrial tie-ins.

Join fixed pipe in tight trenches, at pump stations or during a planned slurry-line shutdown. Match the controller and tooling to your fittings, site power and weld record requirements.

Make the tie-in when the pipe can’t move

Use HDPE electrofusion fittings where a butt fusion carriage needs more room or pipe travel than the job allows. Plan enough access to peel the pipe, fit the clamps and keep the joint dry.

  • Narrow trenches and mine drifts. Join fixed pipe ends where there’s room for a coupler and clamps but limited space to bring in a fusion carriage.
  • Shutdown repairs and bypasses. Replace a damaged section of an isolated, drained line with compatible repair couplers. Where the layout allows, the crew can leave the adjoining pipe runs in place.
  • Pump stations and manifolds. Plan elbows, tees and reducers close to pumps or supports on mine dewatering, tailings and chemical dosing lines. Allow room for joint preparation and restraint at each socket.
  • Different pipe wall thicknesses. At a tie-in between SDRs, confirm that both ends match the fitting’s outside diameter and approved wall range. Check that the assembled joint meets the line’s design pressure and service conditions.

Specify the controller for your site and QA team

  • Barcode or manual entry. Scan a compatible fusion barcode to load the fitting parameters. Where manual entry is supported, use the fitting label and verify the displayed settings before starting.
  • Generator operation. Check that the supply can hold voltage and frequency within the machine’s input limits for the full weld cycle. Size the generator and cables for the controller and the most demanding fitting. See the site power requirements.
  • Weld records for handover. Tell us which fields your QA team needs, such as operator ID, date, temperature and cycle result. Ask whether the quoted model can store those details and export them via USB.
  • Protection and leads for field work. Share the expected dust, water exposure and working temperatures. Ask for the quoted model’s operating limits, lead adapters and documented enclosure protection, including any IP rating.

Four steps for a controlled electrofusion joint

  1. Prepare and scrape. Cut the pipe square, mark insertion depth and peel the full fusion zone with an approved rotary pipe scraper sized to the pipe OD.
  2. Clean and clamp. Follow the fitting maker’s cleaning procedure. Seat the pipe to its marks, then align and support it with the specified restraint clamps.
  3. Scan and weld. Connect the leads and adapters specified for the terminals. Verify the fusion settings, start the cycle and record completion or any fault.
  4. Cool under restraint. Leave the assembly clamped and undisturbed for the specified cooling interval. Follow the fitting instructions and project procedure for release, backfill and pressure testing.
A gloved worker operates an electrofusion controller connected to a clamped HDPE coupling in a trench.
A clamped HDPE coupling during a trench tie-in.

See the full electrofusion preparation and inspection guide.

Compare electrofusion controller models

Use the catalogue ranges to shortlist a controller. Then check each fitting’s required voltage, current and fusion time against the proposed machine.

ModelStated fitting range
PE31520–315 mm
PE40020–400 mm
PE63020–630 mm
PE120020–1200 mm

Choosing between PE400 and PE630 for repeated welds? Send your fitting schedule, expected number of cycles per shift and available generator details. Puhui can check the required output, confirm the proposed model’s operating limits and help size the site supply.

Request Your Complete Electrofusion Package Quote

Ask for one quote covering the controller, terminal leads, rotary scraper and restraint clamps. We’ll review your fitting list and site power so your crew can plan the full setup before mobilizing.

Send three details for a free compatibility review.

  1. Pipe and fittings. Include the smallest and largest sizes, metric or IPS, pipe SDR and fitting labels or barcodes if available.
  2. Site power. List the supply voltage, phase and frequency, or share the generator’s nameplate and continuous kVA rating.
  3. Documentation. Tell us if you need barcode scanning, USB weld-log export or specific fields for QA handover.
Request a Model & Quote

Request a Quote

Get a formal quote or request a free test sample. A short message about your project is enough to get started.

We usually respond within 12 hours on business days. We treat your enquiry as confidential. Privacy information