Fusion station and tie-ins
Stage joining equipment and pipe supports where crews can handle both pipe ends. Identify the joints that need a different setup, such as a short fitting end or a tie-in to a fixed section.
Get the pipe, fittings and fusion tools to site in the order the crew will need them. Puhui supplies equipment and installation guidance for the ordered components.
Request a QuoteThe installation sequence determines which pipe, fittings and tools need to arrive together. Laydown space and truck access set practical limits on pipe length and the location of the fusion station.
Build the equipment order from the joint list. A machine may cover several ODs with inserts, while electrofusion couplers need their own scraping, alignment and power arrangement.

| Duty or location | Pipe or fitting option | Selection and benefit |
|---|---|---|
| Long field strings | Hydraulic butt fusion machine, inserts, facer and heater | Check actual ODs, working space, power and pipe handling against the machine model. Include rollers or other supports in the site equipment plan. |
| Plant or underground tie-in | Electrofusion fitting and matched controller where specified | Plan access for scraping, alignment and cooling. Check fitting compatibility, power and traceability recording before the crew reaches the tie-in. |
| Removable pump set and test boundary | Flanged assemblies ordered against the mating drawings | Pack each kit with its rings and specify gasket, bolts and installation documents on the packing list. Identify who supplies isolation and test pieces. |
Stage joining equipment and pipe supports where crews can handle both pipe ends. Identify the joints that need a different setup, such as a short fitting end or a tie-in to a fixed section.
List machine inserts, heaters, facers, controllers, scrapers and the spares your crew intends to carry. Mark crates against the installation phase and part numbers so site teams can locate accessories before starting.
Confirm delivery lengths against the last transport leg and the site’s unloading equipment. Label each bundle and crate by line and work front. Keep fusion tools, inserts and critical tie-in parts in the shipment that reaches the site first.
Provide a clean work area and weather protection in dusty, wet or freezing conditions. Check heater and controller records and agree how joints will be logged. Include the project’s approved tests and drain points in the commissioning plan.
Puhui project
Puhui shipped 90 mm and 160 mm SDR11 pressure pipe, butt fusion fittings and backing rings for mining in Mongolia. For remote installation, group the compatible parts by size and workfront so crews have the pieces they need for each section.
Send the joint list, pipe OD and wall ratio, site voltage, phase and frequency, required records and last-mile transport limits. Puhui can quote a shipment that combines pipe, fittings and compatible fusion equipment, with installation guidance for the supplied components.
Request the operator manuals, machine and insert list, product batch records and packing list. The installation crew uses the approved fusion procedure and records joint parameters and field test results against joint IDs.