Pad collection and solution headers
Identify gravity drainage components separately from pressure mains. Put each pipe above or below the liner on the appropriate pad drawing, with load, access and protection requirements for the installation.
Move solution from the plant to the leach pad and back to recovery. Size each HDPE pressure header and transfer main for its own flow and chemistry.
Request a QuoteA heap leach circuit has several duties. Supply headers distribute solution to the pad. Collection pipes carry pregnant leach solution (PLS) to ponds or the recovery plant. Return lines bring raffinate or barren solution back to the circuit.
Copper and gold projects can use different leach chemistry. Separate the collected and recycled streams on the pipe list and give the supplier their actual composition and temperature.

| Duty or location | Pipe or fitting option | Selection and benefit |
|---|---|---|
| Solution distribution | HDPE pressure headers with branches to the pad zones | Schedule operating pressures by elevation and include chemical concentration and temperature. Mark where crews can extend and isolate each zone. |
| Pregnant leach solution collection | Gravity collectors or solid-wall pumped transfer, according to the pad design | List perforated collection pipe, carrier mains and pond discharge as distinct items. State fill loads and liner protection for buried collectors. |
| Raffinate mains and plant tie-ins | Chemical-service PE pipe and compatible flanged assemblies | Specify seals, valve seats, backing ring material and actual mating dimensions for the return to the pad. |
Identify gravity drainage components separately from pressure mains. Put each pipe above or below the liner on the appropriate pad drawing, with load, access and protection requirements for the installation.
Review resin and seal materials using the actual leach recipe. Show sampling points, bolted plant interfaces, flushing and isolation on the schedule. Specify return solution and make-up reagent lines as separate duties.
Coordinate work areas, pipe lowering, protective cover and access with the liner installation sequence. Record collector grade and pipe routing before the pipe is covered. Keep future branches reachable as the pad footprint changes.
Identify approved collection points for leaks, flushing and shutdown. Use the maximum concentration and water temperature expected along the route. Mark sampling, isolation and plant interface locations on the drawings.
Application example
Pregnant leach solution can drain from the pad to a collection pond before pumping to solvent extraction. Raffinate returns to the pad through a separate circuit. Separate gravity collection from pumped feed and return duties so each line has the right bore, joints and pressure basis.
Send the pad plan and list of supply, PLS and return duties. Puhui can price the specified solid-wall transfer pipe and matching fittings. Identify perforated collectors and other pad equipment separately on the package scope.