Stacked HDPE pipes with drilled flanges

HDPE Pipe for Heap Leach, PLS & Raffinate

Move solution from the plant to the leach pad and back to recovery. Size each HDPE pressure header and transfer main for its own flow and chemistry.

Request a Quote

Trace the solution from pad to plant

A heap leach circuit has several duties. Supply headers distribute solution to the pad. Collection pipes carry pregnant leach solution (PLS) to ponds or the recovery plant. Return lines bring raffinate or barren solution back to the circuit.

Copper and gold projects can use different leach chemistry. Separate the collected and recycled streams on the pipe list and give the supplier their actual composition and temperature.

Black pipe following a route across open terrain

Specify three distinct heap leach pipe duties

Duty or locationPipe or fitting optionSelection and benefit
Solution distributionHDPE pressure headers with branches to the pad zonesSchedule operating pressures by elevation and include chemical concentration and temperature. Mark where crews can extend and isolate each zone.
Pregnant leach solution collectionGravity collectors or solid-wall pumped transfer, according to the pad designList perforated collection pipe, carrier mains and pond discharge as distinct items. State fill loads and liner protection for buried collectors.
Raffinate mains and plant tie-insChemical-service PE pipe and compatible flanged assembliesSpecify seals, valve seats, backing ring material and actual mating dimensions for the return to the pad.

Pad collection and solution headers

Identify gravity drainage components separately from pressure mains. Put each pipe above or below the liner on the appropriate pad drawing, with load, access and protection requirements for the installation.

PLS, raffinate and acid service

Review resin and seal materials using the actual leach recipe. Show sampling points, bolted plant interfaces, flushing and isolation on the schedule. Specify return solution and make-up reagent lines as separate duties.

Installation, operation & site conditions

Keep pipe handling and fusion clear of the liner

Coordinate work areas, pipe lowering, protective cover and access with the liner installation sequence. Record collector grade and pipe routing before the pipe is covered. Keep future branches reachable as the pad footprint changes.

Give each circuit a drain and spill route

Identify approved collection points for leaks, flushing and shutdown. Use the maximum concentration and water temperature expected along the route. Mark sampling, isolation and plant interface locations on the drawings.

Application example

Pipe schedules for heap leach collection and return

Pregnant leach solution can drain from the pad to a collection pond before pumping to solvent extraction. Raffinate returns to the pad through a separate circuit. Separate gravity collection from pumped feed and return duties so each line has the right bore, joints and pressure basis.

What Puhui supplies and what to send

Supply package and quotation

Send the pad plan and list of supply, PLS and return duties. Puhui can price the specified solid-wall transfer pipe and matching fittings. Identify perforated collectors and other pad equipment separately on the package scope.

  • Supply, PLS and return line services
  • Concentration and temperature at each stage
  • Gravity or pumped flow and design pressure
  • Pond, valve and plant transition drawings
Request a Project Quote

Standards, approvals & inspection records

Specify the material and pipe standard for each section. Request line-specific resin and seal data, product drawings and batch records. Coordinate the hydrostatic test plan for pressure runs and installation acceptance records for gravity collectors.

Frequently asked questions

Can the same HDPE pipe be specified across the pad?
Separate perforated gravity collection, pressure headers and pumped solution transfer. Each has a different load, joint and acceptance requirement.

Request a Quote

Get a formal quote or request a free test sample. A short message about your project is enough to get started.

We usually respond within 12 hours on business days. We treat your enquiry as confidential. Privacy information