Plant tie-ins
Collect pump and valve drawings early. Show the flange drilling, centreline elevation and loads from supported equipment. Group pipe and fittings by actual outside diameter so plant tie-ins can be preassembled where practical.
Feed grinding, classification and washdown from a common water network. Puhui supplies the fused mains, branch fittings and flange connections that bring water to each plant unit.
Request a QuoteA process-water main can feed grinding, classification, washdown and make-up connections. Lay out the main and each branch by duty, then identify where the HDPE connects to valves and plant equipment.
If the system blends fresh and reclaimed water, include the expected solids and chemistry after blending. That information helps the project team specify the pipe, seals and flushing arrangement.

| Duty or location | Pipe or fitting option | Selection and benefit |
|---|---|---|
| Make-up water main | Fused PE pressure pipe | Choose OD and wall class to carry the plant’s peak combined demand and maintain usable pressure at the farthest connected branch. |
| Mill and washdown branches | Butt fusion tees or electrofusion for restrained tie-ins | Use branch sizes and actual pipe OD on the drawing. Mark where the pipe can be moved for butt fusion and where existing equipment limits access. |
| Pump, screen or tank connection | Flange adapter and backing ring package | Match the nozzle’s face and drilling. Give heavy valves and instruments their own supports and leave working clearance near the bolted joint. |
Collect pump and valve drawings early. Show the flange drilling, centreline elevation and loads from supported equipment. Group pipe and fittings by actual outside diameter so plant tie-ins can be preassembled where practical.
Document how the plant drains exposed lines and how flow changes between production and washdown. Include low points, bypasses and flushing connections in the fitting schedule.
Plan isolatable plant branches so an equipment tie-in can be commissioned without draining the main. Site spools benefit from measured centreline offsets and a record of the nozzle and installed flange before fabrication.
If makeup and reclaim are blended, use the combined chemistry and solids in the materials schedule. Show drains, flush points and how water will be collected if an exposed branch must be emptied ahead of freezing weather.
Puhui project
Puhui supplied SDR9 HDPE pipe and fabricated fittings for high-pressure water transfer at a Chilean copper mine. Specify the straight pipe and plant connections on the same dimensional schedule so the mating components can be checked together.
Puhui quotes a plant list with pipe, tees, reducers, flanged tie-ins and the welding equipment compatible with those ODs. Submit a flow and pressure schedule by branch, installation drawings and delivery lengths.
Specify the approved pipe standard and resin designation. Use the product-specific ISO 4427 or applicable project water-pipe documentation when called for. If a separate drinking-water service requires NSF/ANSI/CAN 61, check the actual product in the current NSF listing.