Restart, flush and blockage management
List the water or air service used for cleaning and the route to the discharge point. Record the design cases for changing branches, interrupted flow and a full column when choosing components.
Specify HDPE where the mine backfill design calls for it. Treat hydraulic fill, cemented paste and flushing as distinct duties so each section gets the required pressure and wear design.
Request a QuoteHydraulic fill carries solids in water. Cemented paste can have different flow, setting and restart behaviour. Identify which mix will travel through each section and where the delivery route changes elevation or splits underground.
Use the backfill engineer’s material schedule for each section. A surface transfer or flushing line, a borehole drop and an underground paste main can call for different materials, joining methods and pressure classes.

| Duty or location | Pipe or fitting option | Selection and benefit |
|---|---|---|
| Hydraulic fill transfer | HDPE where listed in the approved backfill design | Identify the sand or tailings mix, solids fraction and minimum stable flow. Plan abrasive areas and capture flush water by section. |
| Paste borehole and vertical drop | Engineer-specified pressure and wear construction | The section’s hydraulic profile and restart or blockage conditions determine the wall and assembly. List transition locations and the actual mating material. |
| Changeover, flushing and water services | Service-specific pipe, removable spools and flange transitions | Define which lines handle paste and which handle water. Schedule access for branch changes and gasket, valve and flange replacement. |
List the water or air service used for cleaning and the route to the discharge point. Record the design cases for changing branches, interrupted flow and a full column when choosing components.
Where the engineer specifies HDPE, procure to the scheduled service, pressure class and wear evidence. Carry the details of HDPE-to-steel transitions, valves and replaceable spools into the fitting drawings.
Review plan and section drawings with operations so branches can be changed with the available handling equipment. Document wear-spool access, isolation and the path from the paste plant to each active stope.
Use the mix setting and rheology data from the backfill designer. Record any full-column pressure and blocked-line design cases. Coordinate how flush water and backfill are captured before installing drains and spools.
Application example
A backfill system can use a borehole drop to reach a lower level, then distribute paste along lateral runs to the stopes. Check pressure, wear and pipe material by route section using the paste properties, elevation profile and planned restart conditions.
Request the HDPE items identified on the approved backfill schedule from Puhui. Include the line service, drawings, material and pressure zone, wear requirement, changeover joints, quantities and destination.
Request batch records, actual dimensions, component drawings and the joining procedure for each specified material. Confirm the owner’s materials and pressure acceptance for the complete line, including HDPE-to-steel transitions.