Pipelines running across terraced ground

HDPE Pipe for Mine Tailings Transport

Run tailings from the thickener to storage and extend deposition lines as the facility grows. Pair a fused HDPE main with accessible branches and replaceable discharge fittings.

Request a Quote

From the thickener to the discharge point

A tailings line can start at a thickener, cross a long elevation profile and finish in spigots that are moved as deposition progresses. Split the main, distribution branches and removable discharge lengths on the pipe schedule.

Copper, iron ore, gold and coal tailings vary in grind, solids content and chemistry. Use the plant’s normal and upset operating ranges to size each part of the line.

Parallel pipelines on a graded earth route

Specify the tailings main and deposition branches

Duty or locationPipe or fitting optionSelection and benefit
Thickener to storage facilityFused HDPE main with selected pressure classesSeparate pump discharge, crossings and low points by chainage and pressure. Keep the internal bore in the hydraulic schedule when wall thickness changes.
Deposition header and spigotsFabricated branches and removable flange assembliesProvide spigot positions and orientation, blind ends and the planned order of future connections. Keep removable sections reachable as the deposition area changes.
Return-water circuitSeparate reclaim main and shore connectionReclaim water has its own solids profile, suction conditions and route. Use a separate pressure and fitting schedule for the return circuit.

Conventional slurry and thickened tailings

Thickener underflow can vary over a shift. As solids rise, the pressure needed to restart and clear the line can change. For paste or highly thickened tailings, use measured rheology and distinguish the transport line from a cemented backfill circuit.

Deposition and future extensions

Separate fixed mains from sections that crews will move or replace. Include connection details for branches, transitions and removable spigots. Specify how each section drains or flushes when isolated.

Installation, operation & site conditions

Build and commission in sections

Use the route profile to set test sections and safe drain points. Retain the chainage, fusion record and component traceability for each installed section. Record deviations at crossings, supports and deposition branches in the as-built drawings.

Plan changes to the storage facility

Allow for access to isolation valves and spigots as the facility develops. Identify where a spill or flush would flow and coordinate monitoring and response arrangements with the facility’s operating plan.

Design example

Pressure zoning on a copper mine tailings line

Consider a 630 mm OD PE100-RC tailings line with separate pressure zones for the pump discharge, downhill transition and exposed run. Set the wall class for each zone from its operating and transient pressures, then check the bores and joining details at each SDR transition.

What Puhui supplies and what to send

Supply package and quotation

Puhui quotes straight pipe, fabricated tees, bends, flange kits and fusion equipment against the chainage schedule. Submit the solids range, route profile, design pressure by section, maximum restart conditions, deposition drawing and shipping lengths.

  • Tailings concentration and rheology
  • Route elevation and deposition layout
  • Operating, surge and restart pressures
  • Valve, spigot, drain and flush locations
Request a Project Quote

Standards, approvals & inspection records

Submit the finished-pipe standard, material and pressure basis, bend and branch drawings, batch reports and inspection plan. The facility owner’s tailings management requirements govern the installed system. The pipe submittal supports that record with traceable materials and as-built joint documentation.

Frequently asked questions

How does thickened tailings service affect the pipe order?
Use measured rheology and the restart pressure to choose the bore and wall class. Break out high-wear bends and removable discharge pieces in the bill of quantities.
Can the tailings and reclaim mains use one schedule?
List them as separate duties. Use each stream’s chemistry, solids loading and operating pressures to specify its pipe and joints.

Request a Quote

Get a formal quote or request a free test sample. A short message about your project is enough to get started.

We usually respond within 12 hours on business days. We treat your enquiry as confidential. Privacy information