Pipe running alongside an open drainage channel

HDPE Pipe for Mine Dewatering

Pump water out of pits and underground sumps with HDPE pipe and fittings sized for the lift. Keep flanged sections accessible where crews need to move pumps or extend the discharge.

Request a Quote

Lift water out of the pit or workings

As an open pit deepens, the pump may move and the lift to the discharge point grows. Section lengths and bolted connections affect how quickly the crew can extend or relocate a line.

Underground systems can collect water in sumps before lifting it by stages to the surface. Separate gravity drainage, pump discharge and any chemically affected water in the schedule.

Pipe crossing a vegetated slope

Match the pipe package to the pump system

Duty or locationPipe or fitting optionSelection and benefit
Open-pit pump dischargeBlack HDPE pressure pipe with flanged changeover lengthsSize for the lowest planned sump and maximum discharge elevation. Put flanges where extending or moving the pump line will interrupt the fewest joints.
Underground rising mainPressure pipe by pump stage with supported valve connectionsSchedule each lift, pressure zone and shut-off head. Show wall penetrations, fixed supports, check valves and transitions between stages.
Long exposed runWhite co-extruded option where solar heating mattersUse the expected pipe and water temperature in the pressure assessment. Keep temperature, support layout and the design pressure together in the RFQ.

Open-pit dewatering

Review the lowest planned sump level against the highest discharge elevation. Retain the route profile for surge and air management. For moveable sections, list the bolted joints, supports and delivery lengths separately.

Underground drainage and discharge

Identify gravity-fed laterals, pump stages and rising mains. Document pressure by section and show where the line meets the surface treatment or discharge system. For low-pH drainage, order against the chemistry at each stage.

Installation, operation & site conditions

Install for the next pit phase

Put extension kits, matching flange fasteners and spare gaskets at the site where the pump moves. Give the crane or handler access to the flanged lengths. Keep the rising main clear of haul routes or provide the crossing protection in the route design.

Check the full pressure envelope

Use the pump curve, shut-off head, static lift and pump trip conditions. Start-up, power loss and check valve closure can change positive and negative pressures along the line. Route discharge to the designated pond, treatment plant or approved outfall.

Puhui project

High-pressure water piping for a Chilean copper mine

Puhui supplied SDR9 HDPE pipe and fabricated fittings for a high-pressure water transfer line at a copper mine in Chile. For a similar order, coordinate the pipe wall schedule with the fitting drawings so the pipe and fabricated connections fit on site.

What Puhui supplies and what to send

Supply package and quotation

Puhui supplies black pressure pipe, fabricated bends, stub ends and backing rings. Provide the normal and maximum head, size series, design temperature, section lengths, flange drawings and destination so the quote identifies every pressure zone and interface.

  • Pump curve and shutoff head
  • Lowest and highest pump elevations
  • Pipe route, supports and relocatable sections
  • Solids load and discharge destination
Request a Project Quote

Standards, approvals & inspection records

Ask for the pressure basis of the exact resin, standard and wall class offered, along with batch test records and component drawings. Include the project’s field leak-test procedure and acceptance record. Where the project specifies ASTM F2164, apply it to field hydrostatic leak testing of the PE pressure line.

Frequently asked questions

Is SDR9 the right wall for a high-lift mine?
SDR9 is a wall ratio. Calculate the pressure envelope and temperature by section, then select a pipe and fitting assembly with the required pressure basis.
Where should crews use flanged joints?
Use flanges at pumps, valves and planned dismantling points. Butt fusion is suitable for permanent straight runs with room for the machine and pipe handling.

Request a Quote

Get a formal quote or request a free test sample. A short message about your project is enough to get started.

We usually respond within 12 hours on business days. We treat your enquiry as confidential. Privacy information