The shore transition
Treat the connection between floating and fixed pipe as a separate assembly. Include support and movement requirements with mating dimensions, water levels and expected loads.
Put recovered water back to work at the plant. Specify the fixed HDPE return main and flanged shore connection around the pond’s changing water level.
Request a QuoteReclaim lines can run from a floating or shore-mounted intake to a process-water tank. As pond level changes, the intake moves and pump lift changes. Specify the travelling section, shore connection and fixed main separately.
Residual fines and treatment chemicals affect the way the return line is operated. Give the designer water analyses for the normal return stream and seasonal changes.

| Duty or location | Pipe or fitting option | Selection and benefit |
|---|---|---|
| Moving or floating intake | HDPE sections within the engineered intake assembly | Show high and low pond levels, movement range, and who supplies floats, tethers and intake equipment. A changing water level changes the pump lift. |
| Shore connection | Flanged transition with independent support | Specify movement allowance and the loads at the fixed connection. Confirm flange drilling and locations that can be reached when the water level falls. |
| Fixed reclaim-water main | Fused PE pressure pipe with accessible drain and flush points | Size for residual solids and available pump head. Put screening and flushing in the operating plan so carried fines can be cleared. |
Treat the connection between floating and fixed pipe as a separate assembly. Include support and movement requirements with mating dimensions, water levels and expected loads.
Identify the route to storage, blending or direct reuse. Keep the reclaimed-water duty separate from fresh water where the operating pressure or fluid composition differs.
Set out the shore transition and line supports using the full pond-level range. At the fixed main, support pumping equipment before mating the pipe and flanges. Retain room for retrieval, inspection and a change of the intake section.
Identify what happens during intake blockage, storm inflow or a pump outage. Review air admission, drains and where flushing water returns. The mine’s water management plan determines when reclaimed water can be blended or bypassed.
Application example
A mine water circuit can combine raw-water transfer, treated-water distribution and reclaim from the tailings facility. Schedule the streams separately so solids content, treatment chemistry and pump discharge pressure are checked for each line.
Send the low and high pond elevations, chemistry, suspended solids and pump curve. Puhui can quote the HDPE main, fused fittings and flange transitions to the intake equipment and plant. Identify floats and intake hardware separately on the package scope.
Ask for pipe and fitting data sheets keyed to the line schedule, material traceability and a pressure-test plan for the fixed main. Use the project’s water chemistry and component records to review seals and valve seats where return water is chemically affected.