Benched open pit mine

HDPE Pipe for Copper, Gold & Other Mines

From copper and gold to coal and aggregates, choose piping around the processes that move water, solids and solution at your mine. Each service links to component and project details.

Request a Quote

Start with the process flow sheet

Open-pit mines typically have pit drainage and long surface runs. Underground mines also have sumps, staged lifts and confined installation areas. A project may need several independent pipe schedules on the same site.

The ore and processing route determine which slurry, tails, water and leach services appear on the schedule. Start with the stream and then describe its pressure, temperature, solids and route.

Industrial processing plant with conveyors

Choose the pipe package by what the mine moves

Duty or locationPipe or fitting optionSelection and benefit
Copper and gold minesMill slurry, tailings, pit discharge or leach solution pipeStart from the process flow sheet. Keep concentration plant duties separate from a heap leach circuit and treatment or reclaim lines.
Iron ore, coal and aggregate operationsSlurry transfer, classification and tailings linesUse the actual coarse and fine fractions for pump and wear work. Include site drainage chemistry and water recovery when scoping the package.
Surface and underground minesPressure mains, pit extensions and staged rising mainsSurface routing brings solar exposure and truck crossings. Underground routes bring elevation, confined fusion access and fixed equipment tie-ins.

Copper and gold

Separate mill slurry and concentrate from tailings and reclaim. At heap leach operations, list feed, PLS collection and return solution individually with the chemistry used for that ore.

Iron ore, bauxite and coal

Ore preparation and washing can generate coarse slurry and fine tailings in the same plant. Use the particle distribution from each stream to separate wash plant, concentrate, fines and discharge duties. Include water chemistry in coal mine drainage schedules.

Aggregates, oil sands and industrial minerals

For quarry, sand or oil sands duties, characterize the coarse fraction and abrasive load. Phosphate, potash and lithium operations can add process water, brine or chemical service. Record the actual fluid composition before selecting pipe and connections.

Installation, operation & site conditions

Build the schedule from the process flow sheet

Break the package into line services before comparing prices. Keep product and installation drawings tied to line IDs so a change from metric to IPS or from one pressure class to another is carried through pipe, fittings and machine inserts.

Use site conditions to plan construction and maintenance

Elevation, frost, sun, access and seasonal water conditions affect pipe pressure and installation. Mark crossings, recovery ponds, maintenance routes and tie-in windows where they affect the supplied pieces.

Puhui project

Mine pipe deliveries in Panama and Mongolia

Puhui supplied white-outer, black-inner co-extruded HDPE pipe for a copper mine in Panama and an HDPE pipe and fitting package for mining in Mongolia. Select the wall construction, fittings and connections together when specifying a mine pipeline package.

What Puhui supplies and what to send

Supply package and quotation

Puhui supplies HDPE pipe, fittings and fusion equipment for international mine projects. Provide the mine and process type, line list, operating conditions and destination. Each quoted service can then be matched to current product and fitting data.

  • Pit water collection and pumped discharge
  • Mill slurry and concentrate transfer
  • Tailings deposition and reclaim water
  • Leach solution collection and return
Request a Project Quote

Standards, approvals & inspection records

Include standards, material designations, dimensions and acceptance documents by line. Product standards and issuer listings serve different checks. For a separately specified buried fire protection system, verify the applicable FM 1613 product and installation scope.

Frequently asked questions

What is the best way to request a mine-wide quote?
Send separate line lists for water, slurry, tailings, process fluids and any listed fire protection systems. Give each service its own pipe, fittings and document requirements.

Request a Quote

Get a formal quote or request a free test sample. A short message about your project is enough to get started.

We usually respond within 12 hours on business days. We treat your enquiry as confidential. Privacy information