Copper and gold
Separate mill slurry and concentrate from tailings and reclaim. At heap leach operations, list feed, PLS collection and return solution individually with the chemistry used for that ore.
From copper and gold to coal and aggregates, choose piping around the processes that move water, solids and solution at your mine. Each service links to component and project details.
Request a QuoteOpen-pit mines typically have pit drainage and long surface runs. Underground mines also have sumps, staged lifts and confined installation areas. A project may need several independent pipe schedules on the same site.
The ore and processing route determine which slurry, tails, water and leach services appear on the schedule. Start with the stream and then describe its pressure, temperature, solids and route.

| Duty or location | Pipe or fitting option | Selection and benefit |
|---|---|---|
| Copper and gold mines | Mill slurry, tailings, pit discharge or leach solution pipe | Start from the process flow sheet. Keep concentration plant duties separate from a heap leach circuit and treatment or reclaim lines. |
| Iron ore, coal and aggregate operations | Slurry transfer, classification and tailings lines | Use the actual coarse and fine fractions for pump and wear work. Include site drainage chemistry and water recovery when scoping the package. |
| Surface and underground mines | Pressure mains, pit extensions and staged rising mains | Surface routing brings solar exposure and truck crossings. Underground routes bring elevation, confined fusion access and fixed equipment tie-ins. |
Separate mill slurry and concentrate from tailings and reclaim. At heap leach operations, list feed, PLS collection and return solution individually with the chemistry used for that ore.
Ore preparation and washing can generate coarse slurry and fine tailings in the same plant. Use the particle distribution from each stream to separate wash plant, concentrate, fines and discharge duties. Include water chemistry in coal mine drainage schedules.
For quarry, sand or oil sands duties, characterize the coarse fraction and abrasive load. Phosphate, potash and lithium operations can add process water, brine or chemical service. Record the actual fluid composition before selecting pipe and connections.
Break the package into line services before comparing prices. Keep product and installation drawings tied to line IDs so a change from metric to IPS or from one pressure class to another is carried through pipe, fittings and machine inserts.
Elevation, frost, sun, access and seasonal water conditions affect pipe pressure and installation. Mark crossings, recovery ponds, maintenance routes and tie-in windows where they affect the supplied pieces.
Puhui project
Puhui supplied white-outer, black-inner co-extruded HDPE pipe for a copper mine in Panama and an HDPE pipe and fitting package for mining in Mongolia. Select the wall construction, fittings and connections together when specifying a mine pipeline package.
Puhui supplies HDPE pipe, fittings and fusion equipment for international mine projects. Provide the mine and process type, line list, operating conditions and destination. Each quoted service can then be matched to current product and fitting data.
Include standards, material designations, dimensions and acceptance documents by line. Product standards and issuer listings serve different checks. For a separately specified buried fire protection system, verify the applicable FM 1613 product and installation scope.